On our last update I stated that 1800 square feet of deck tile was being installed and our tile installer gave an estimate of two weeks and he is is only seven weeks short on his estimate. About 500 feet of tile remains to be install on the lower floor.
Carpet for the Guest Suite, hall bedroom and stairs has been picked out and should be installed in the next 30 days.
1,500 square feet of wood flooring is proceeding much better than the tile. Three days into the job and about 500 s.f. remain. This should be finished by tomorrow.
All the cabinet hardware has been installed and the pictures are available at www.ronphotos.notlong.com
All but one of the Schlage lever handles have been installed. We are also using 13 of the Schlage "Link" combination locks that can be controlled from any computer or cell phone Worldwide.
Stay tuned.